01
The subfloor
How we quote it
Checked before we quote. Soft spots and failed decking cut out and replaced.
Often left off
Assumed to be fine. Checking takes time, and finding a problem makes the number bigger.
If it is skippedThe new floor develops a dip or a soft spot within a couple of years, and the fix means pulling up the floor you just paid for.

